AdvertiseDonate
LatestIrvine Election: Residents approve ranked choice voting
Los AngelesLong BeachSanta AnaAnaheimIrvineRiversideBakersfieldSan Diego
Thursday, November 5, 2026Big-city news, all in one place.
Verified Blast · 9465 Wilshire Blvd., Suite 300, Beverly Hills, CA 90212

Latest stories

  1. Irvine Election: Residents approve ranked choice voting
  2. 2028 Presidential Race Kicks Off as Ossoff and Vance Set Early Tones
  3. Canby Assault: 36-Year-Old Accused of Hammer Attack, Kidnapping
  4. Ward 2 Council Lead Narrows to 3.5 Points Amid 455,000 Unprocessed Ballots
  5. Brand Remanded in Custody After Guilty Verdict in London Rape Trial

Griffin-1 Lander Completes Vibration Tests at JPL

The spacecraft survived shake, heat, and noise trials in Southern California, clearing the path for a late 2026 launch to the lunar south pole.

By Lucia Orlov ·

Illustration for: Griffin-1 Lander Completes Vibration Tests at JPL
Illustration generated for this article, not a news photograph.

Voyager Technologies confirmed on Thursday that its Griffin-1 lander has passed final environmental tests at NASA’s Jet Propulsion Laboratory in Southern California. The successful completion of these trials moves the mission closer to its scheduled launch later this year. The lander will deliver 455 kilograms of cargo to the lunar south pole.

The testing process began after the lander was integrated with its payload. Engineers at JPL subjected the spacecraft to extreme temperature fluctuations and intense mechanical vibrations. They also simulated the high-decibel acoustic environment the vehicle will face during launch and descent. An image captured on Aug. 31 shows the Griffin-1 inside JPL’s 25-foot-wide space simulator.

Charles Whetsel, manager of the Exploration Systems Development Office at JPL, noted that the facility has tested robotic explorers since the Ranger program of the mid-1960s. He stated that the laboratory is proud to support this new phase of commercial lunar exploration.

Griffin-1 will operate under NASA’s Commercial Lunar Payload Services initiative. The payload includes science experiments and the FLIP rover built by Astrolab. That rover carries a supercomputer designed to operate on the moon’s surface.

NASA plans to use data and infrastructure from this mission to support the construction of a crewed lunar base. The agency aims to establish that base near the south pole within the next five years.

Source: Space.com

More Tech · Report a business · Got a Story?

Get Verified Blast in your inboxBig-city news, all in one place. Free, a few times a week, unsubscribe any time.

Related stories

Get Verified Blast in your inboxBig-city news, all in one place. Free, a few times a week, unsubscribe any time.